
Troon Country Club
The first course Tom Weiskopf ever designed, still built around its original greens
Troon Country Club opened in 1986 as the first golf design by Tom Weiskopf, working with Jay Morrish. Forty years on it has hosted two U.S. Mid-Amateurs, rebuilt every playing surface under Weiskopf's own eye, and is finishing a practice facility meant to rank with the best in the Southwest.

A First Design That Held Up
The name comes from a Claret Jug.
Weiskopf won the 1973 Open Championship at Royal Troon, and when he turned to course design, the Scottsdale project he took on with Jay Morrish carried that name. It was his first design and the first of many he and Morrish would build together.
The layout barely moved for 34 years. Aside from a few minor projects it stayed as built, and when the club finally opened it up in 2020, the man who drew it came back to supervise. His verdict on the original work was blunt, and it says more about the course than any rating does.
“Over 34 years, we never had to re-do a green because it was too severe and never had to change much on a hole.”

Two Par 3s Everyone Remembers
One is long over water, and the other is short with little room to miss.
The 207-yard 7th, called The Lake, is ranked the hardest of the four one-shotters, with water fronting the green. It sits in the stretch where the club keeps its irrigation ponds, on the 7th, 8th and 9th.
The 15th is the photograph. At 139 yards it asks for a carry over a ravine to a plateau green ringed by cactus. For the 2025 U.S. Mid-Amateur, the course was listed at 6,915 yards and par 70, with a 73.6 rating and 149 slope from the championship setup. Par 70 at that slope tells you where the difficulty lives: it comes from precision and four demanding short holes, more than raw length.

What Changed in 2020
A seven-month, $4.6 million renovation with few design changes.
Weiskopf and design consultant Phil Smith oversaw the work with Heritage Links as contractor. Every green was resurfaced in A4 bentgrass. Tees were leveled and expanded, with several new forward tees, and tees, fairways and rough were regrassed in TifWay 419.
Bunkers were modified, some removed, and rebuilt with Capillary Concrete liners and Caltega sand so they drain fast after a monsoon. A new irrigation system lets the crew control each sprinkler head individually. The club reports that overall water use has come down since, even with lower average rainfall in recent years.

The 2026 Practice Project
A $4.3 million upgrade to the practice facilities.
Construction started May 1, 2026 under Phil Smith, Weiskopf's design partner. The plan adds range tee space with TrackMan across the entire practice tee, a 12,500-square-foot putting green that is 4,000 square feet larger than the old one and built with more slope, and a 50,000-square-foot short game area more than four times the size of the previous one.
Artificial mats on the south end of the tee are meant to keep the range open through frost delays. The same project widens and relines the three ponds, which today hold 3.5 million gallons on 2.1 acres, more than doubling storage. As announced, the range was due back in early November after overseed, with the putting green and short game area following December 1.

The Clubhouse Renovations
The clubhouse was renovated first.
The clubhouse came before the course: a $7.5 million expansion by Douglas Fredrikson Architects of Phoenix, finished in January 2018. It added a second floor holding a 9,000-square-foot health and wellness center with group class space, a private Pilates studio, physical therapy, a stretching area and a steam room.
Put the three projects in a row, the clubhouse in 2018, the course in 2020, and practice and water in 2026, and you can read how the club spends: in stages, each one finished before the next begins.
The details that matter
- Par is 70 in championship setup, so scores here don't compare directly with a par 72 next door.
- A4 bentgrass greens over a bermuda base means summer agronomy matters; ask how the greens are managed through the hottest months and when the course closes for overseed.
- The 15th's plateau green is the shot to practice. Short is ravine.
- Troon Country Club and Troon North are different properties. Troon North served as stroke-play co-host for the 2025 Mid-Am, and Troon North is the one you can book.
- Many fairways, particularly on the back nine, are lined with homes, so lot position relative to the landing areas matters on those holes.
Membership and access
Troon Country Club is private. Membership categories, availability and initiation terms aren't published in a form we could verify, so the club's membership office is the place to confirm them, along with whether anything changes for owners of nearby homes.
Homes nearby
The course runs through the Troon community beneath Pinnacle Peak, with homes backing onto many fairways. On golf frontage, walk the lot at the time of day it plays and check where the tee shots actually land.
Questions
Who designed Troon Country Club?
Jay Morrish and Tom Weiskopf, opening in 1986. It was Weiskopf's first course design, and he helped oversee the 2020 renovation with Phil Smith.
Has it hosted national championships?
Yes. The U.S. Mid-Amateur in 1990 and 2025, and the U.S. Senior Women's Amateur in 2023.
Is it the same as Troon North?
No. They're separate facilities. Troon Country Club is private, and Troon North takes public play.
What grass is on the course?
A4 bentgrass greens and TifWay 419 bermuda tees, fairways and rough, installed in 2020.

Weiskopf's first course
If you're weighing a home along these fairways, we'll walk the lot with you and read where the golf meets the property line.
Sources
- First Call Golf, Troon Country Club reopens after renovation, Dec. 1, 2020
- First Call Golf, Troon CC practice facility and water storage project, June 16, 2026
- First Call Golf, USGA awards Troon Country Club two championships, March 16, 2021
- Top 100 Golf Courses, Troon Country Club
- USGA, fast facts for the 2025 U.S. Mid-Amateur
- Troon Country Club, site

